Auriga 1400 proves once again why it’s the go-to choice for challenging offshore cable work.
In 55 hours last week, it flawlessly laid 35 km of 310 mm high-voltage export cable at a wind farm, keeping a steady 3-meter burial depth in 45-meter-deep waters with low visibility and tricky seabed conditions. With an impressive pace of 10m–13m per minute, the system faced the challenge head-on, and emerged without a single hitch.
Auriga 1400’s impeccable operation won full recognition on-site, confirming once again the reliability of its high-speed performance. Its continuous success in such a demanding offshore environment proves the system is ready for stable, efficient, large-scale subsea operations, and has generated strong interest across the market.
When expertise, innovation, and robust solutions come together, the results speak for themselves – delivering performance that keeps subsea projects moving forward, whatever the challenge.